An Example for a Structure of 2 x 4 Housing Panel Method
The panels that are manufactured at our mill will be transported to a construction site, and then a crane will be used to construct one panel after another. It is unnecessary to cut materials, therefore, a drastic reduction in wasted materials is possible during the construction.
>> >>

>> >>

>> >>
click to enlarge picture

For a two-story house construction, it usually takes a day to finish paneling from a foundation to a 1st floor, and then the 1st floor ceiling to a 2nd floor ceiling takes another day to finish paneling. A construction time can be reduced sharply by using this paneling methods. As a result, an overall construction fee is also kept minimum effectively.