An Example for a Structure of 2 x 4 Housing Panel Method
The panels that are manufactured at our mill will be transported to a construction site,
and then a crane will be used to construct one panel after another. It is unnecessary
to cut materials, therefore, a drastic reduction in wasted materials is possible during the construction.
>>
>>

>>
>>

>>
>>
click to enlarge picture
For a two-story house construction, it usually takes a day to finish paneling from
a foundation to a 1st floor, and then the 1st floor ceiling to a 2nd floor ceiling
takes another day to finish paneling. A construction time can be reduced sharply
by using this paneling methods. As a result, an overall construction fee is also kept minimum effectively.
Nana Pacific Corporation
TEL:0771-22-6340     FAX:0771-22-5095
